Decide whether city or county departments likely handle the project. This tool is independent and does not replace official department review.
The tools on this page are designed to help users prepare better questions before they contact a department or open an official portal. They are not replacements for local code review, permit staff, licensed professionals, or official fee schedules.
Use the “Do I Need a Permit?” workflow to identify whether your project might involve structural, electrical, plumbing, mechanical, zoning, demolition, occupancy, fire, or public works review.
Use the fee estimator as a planning worksheet only. Final fees may depend on valuation, square footage, plan review, trade permits, technology surcharges, impact fees, reinspections, and local ordinances.
Use the checklist generator to organize drawings, site plans, owner authorization, contractor details, energy forms, and special review documents before applying.
Use the inspection checklist before requesting rough-in, trade, framing, final, or reinspection appointments. Failed inspections usually cost more time than preparing correctly.
Use the city-vs-county guidance before submitting. Applying to the wrong office is one of the fastest ways to lose time.
After using any tool, confirm the result with the official department page linked from the state, county, or permit detail page.
| Tool | Best for | What it does not replace | Best next step |
|---|---|---|---|
| Do I Need a Permit? | Early project screening | Official jurisdiction decision | Check the county/city permit page and confirm scope rules. |
| Permit Fee Estimator | Budget planning | Official invoice or fee schedule | Open the official fee schedule before payment. |
| Document Checklist | Application preparation | Reviewer-specific correction letter | Compare checklist with current application instructions. |
| Inspection Checklist | Reducing failed inspections | Inspector decision or code interpretation | Keep approved plans on site and verify inspection type. |
| Status Tracker Helper | Understanding review stages | Official portal login or staff update | Use the official status link with permit number or address. |
Use tools for planning only. Permit payments should happen through the official jurisdiction portal, counter, or verified payment instruction.
Fees and application rules can change. Re-check official sources before submitting or budgeting final costs.
Electrical, plumbing, mechanical, gas, fire, and solar work often have separate license and inspection requirements.
Save screenshots, portal messages, receipts, correction letters, and inspection results in one project folder.
A tool can explain status terms, but only the official portal or department can confirm your application status.
If the tool suggests that a permit may be required, confirm before demolition, framing, wiring, plumbing, or covering work.