Arlington County, Virginia building permits
Arlington County, Virginia runs its permitting through Accela Citizen Access. Accela splits everything behind a row of tabs — typically Building, Planning, Enforcement and Licenses — and each tab has its own search form. Most Accela sites let you look up an existing permit without an account, but you must register before you can start a new application or pay a fee.
Quick answer
- Arlington County, Virginia handles building permits through Accela Citizen Access.
- The office address listed is 2100 Clarendon Boulevard, Arlington, VA 22201.
- Arlington County, Virginia publishes an online permit records search, so an existing permit can be looked up without contacting the office.
- This summary was compiled from the jurisdiction's own website on 2026-08-06.
- Office as listed
- Use Permits – Official Website of Arlington County Virginia Government
- Address
- 2100 Clarendon Boulevard, Arlington, VA 22201
- Permit platform
- Accela Citizen Access
- County type
- County jurisdiction in Virginia
- Official source
- arlingtonva.us
- Last checked
- 2026-08-06
Official Arlington County permit links
Every link below points at Arlington County's own website, not at a copy of it. We retrieved them on 2026-08-06.
Does Arlington County or your city issue the permit?
Arlington County issues permits for unincorporated territory. If the property has a city or town mailing address that does not automatically mean the city issues the permit — mailing addresses follow postal routes, not jurisdictional boundaries. Check the parcel against the county parcel viewer or ask the office to confirm before you file.
The check that settles it takes two minutes: look the property up in the county parcel or GIS viewer by address or parcel number, and the record names the jurisdiction. Our jurisdiction helper walks through the indicators if you cannot reach the parcel viewer.
Which building code applies in Virginia?
Construction in Virginia is governed by the Virginia Uniform Statewide Building Code. The county enforces that code and may add local amendments on top of it — commonly for wind, seismic, snow load, floodplain or energy provisions — so the local amendment sheet is worth reading alongside the state code itself.
What permits does Arlington County issue?
Arlington County issues permits by category rather than as a single approval, and a project frequently needs more than one. The building permit covers the structure and the overall project; the trade permits cover the systems inside it, and each is inspected separately by a different inspector against a different code chapter.
| Permit type | What it covers |
|---|---|
| Building permit | The core permit. Covers structural work, additions, new construction, alterations that change the load path, and most work that changes the building envelope. |
| Electrical permit | New circuits, panel and service changes, rewiring, and any relocation beyond a like-for-like fixture swap. Requires a rough-in inspection before anything is covered. |
| Plumbing permit | Adding or relocating drain, waste, vent and supply lines. Replacing a fixture in the same position usually falls outside it. |
| Mechanical permit | Furnaces, air conditioning, water heaters, ductwork and venting. Commonly required even for like-for-like replacement because of combustion air and flue requirements. |
| Roofing permit | Re-roofing and sheathing replacement, so an inspector can verify underlayment, flashing and the number of existing layers. |
| Demolition permit | Full or partial demolition. Usually needs utility disconnection sign-off, and on older buildings an asbestos survey. |
| Grading and site work | Ground disturbance, retaining walls above a threshold height, drainage alteration and erosion control. |
| Zoning or land use approval | Setbacks, lot coverage, height, use and accessory structures. A separate approval from the building permit, and frequently the one that stops a project. |
| Occupancy certificate | Issued after final inspection, and required before occupying new construction or after a change of use. |
The categories above are the ones almost every county building department in the United States operates. What differs locally is the threshold at which each is triggered — the shed size, the fence height, the repair value below which no permit is needed. Those thresholds are set by Arlington County and are the single most important thing to read on the official source before you start.
How to apply for a building permit in Arlington County, Virginia
- Confirm jurisdiction before anything else. Establish that the property is in unincorporated Arlington County rather than inside an incorporated city or town. A city mailing address is not evidence either way — postal routes and municipal boundaries are drawn independently. Getting this wrong costs more time than any other single mistake, because you do not discover it until intake rejects the package.
- Check zoning before you commission drawings. Setbacks, lot coverage and height are zoning requirements rather than building code, and they are decided independently of whether the structure is sound. A setback problem found after design means redrawing, so establish it first.
- Write the scope of work properly. A vague scope is the most common intake rejection, and it causes damage further downstream: the scope decides which permit type applies, which departments review it, and what the inspector will check. A wrong permit type usually surfaces at inspection, which is the most expensive point to find it.
- Register on Accela Citizen Access before you start filling anything in. Arlington County runs applications through Accela Citizen Access, and most actions — saving a draft, uploading drawings, paying an invoice — require you to be signed in. Creating the account first avoids losing a part-completed form.
- Submit a complete package, not a partial one. Intake staff check completeness before the application enters review. An incomplete submission is returned rather than queued, so a missing certificate costs you the whole queue wait rather than a day.
- Answer every correction comment in one resubmission. Expect at least one round of comments on anything non-trivial. This round is where most calendar time is lost, and it is lost by responding piecemeal — each partial response goes to the back of the queue again. Cloud or itemise the changes so the reviewer can see what moved.
- Expect the invoice at issuance. Most offices invoice when the permit is issued rather than when it is submitted. An application that has gone quiet is usually still in review rather than waiting on your payment.
- Book inspections in sequence, and never cover uninspected work. Each stage has to be visible when the inspector arrives. Insulating or drywalling over uninspected rough-in is the most expensive mistake on a residential job, because the only remedy is to open it back up.
- Get the permit finaled in writing. A permit that is never finaled stays open on the property record indefinitely and transfers to the next owner, which is why it surfaces at sale. Treat the final inspection as a distinct task with a named owner rather than assuming the contractor handled it.
Arlington County permit fees: how the invoice is built
Arlington County publishes its fee schedule as Fee Schedules. We do not reproduce the figures, because fees are set by ordinance and revised without notice, and a stale number would cost you more than no number.
What you can rely on is the shape of the invoice. A base permit fee, usually tied to declared valuation above a threshold. A plan review fee, commonly a fixed percentage of it. Separate electrical, plumbing and mechanical permits, invoiced individually rather than bundled. Zoning review where footprint, height or use changes. Impact fees on new dwelling units, which on new construction frequently exceed the permit fee several times over and are the line people most often fail to budget for. Then surcharges — technology, records, state — listed apart from the headline number.
Declare the valuation accurately and include labour even where you supply it yourself. Offices maintain valuation tables and will correct a declaration that falls below them, and an under-declaration found later is treated as misrepresentation rather than error. Full breakdown of how permit fees work.
Booking a building inspection in Arlington County
Arlington County takes inspection requests through Inspections.
Ask what the daily cutoff time is when the permit is issued. Requests after it roll to the following business day, and the cutoff is routinely earlier than people assume — mid-afternoon is common and some offices are earlier still. You will normally be given a window rather than a time, and someone who can answer questions and provide access should be there for all of it.
The sequence runs footing, under-slab, rough-in for each trade, framing, insulation, drywall and final. The order matters more than the list: every stage has to be visible when the inspector arrives, which is why insulating or drywalling over uninspected rough-in is the most expensive mistake on a residential job. What happens when an inspection fails.
How to look up a building permit in Arlington County, Virginia
In Accela the public record search is usually reached from the tab bar rather than the home page. Search by permit number if you have it; otherwise switch the form to address search and enter the street number and street name only. Leaving off the suffix (Road, Street, Avenue) returns more results, because Accela matches the address string literally and a mismatch in the suffix returns nothing.
Search by parcel number rather than street address wherever Arlington County offers the option. Addresses are renumbered, re-suffixed and reassigned as areas develop, and a property standing for sixty years may have had several. Parcel numbers usually survive all of it, so a parcel search returns the complete history where an address search returns a partial one.
Permit records are public records in every state, and you do not need to own the property to request them. That is exactly how buyers and their inspectors check a property before closing, and it is a routine request rather than a favour.
Arlington County permit forms and submittal documents
Arlington County publishes its forms as Form Based Code Review Process. Download the form on the day you submit rather than reusing one from a previous project — forms are revised regularly and offices reject superseded versions. That is also why we link to the source instead of hosting copies here.
Every application needs the parcel number, a written scope of work, declared valuation, owner authorisation or an owner-builder declaration, and contractor licence and insurance details. Scope adds to that: drawings and structural details for anything load-bearing, a site plan with setbacks for new footprint, energy compliance forms for conditioned space, load calculations and fixture counts for trade work, an elevation certificate in a flood zone. The full submittal checklist.
What goes wrong most often in Arlington County
Two Accela quirks catch people out. Records created before the jurisdiction moved to Accela are often not loaded, so an older permit may return no result even though it exists on paper. And a saved-but-unsubmitted application expires from your dashboard after a set period, which is why a half-finished application sometimes disappears.
The second recurring problem is local amendments. Arlington County enforces the statewide code but may amend it — wind, seismic, snow load, floodplain and energy provisions are the usual candidates — and the amendment sheet is published separately from the code itself. Reading only the state code will miss them.
The third is record coverage. Online permit searches typically hold only what was created in the jurisdiction's current system, and digitisation cut-offs in the 1990s and 2000s are normal. A search returning nothing on an older property is weak evidence that work was unpermitted; ask the office to check the paper file before drawing a conclusion.
Nearby permit offices in Virginia
Property near a boundary is frequently under a different office than owners expect. These are the other counties we list in Virginia:
More detail for this jurisdiction
Arlington County, Virginia building permit FAQ
Do I need a building permit in Arlington County, Virginia?
Structural work, new footprint, electrical or plumbing that moves, mechanical replacement, roofing, demolition and any change of use all require a permit in Arlington County, Virginia, as they do in almost every US jurisdiction. Purely cosmetic work — paint, flooring, cabinets, like-for-like fixture swaps — generally does not. The exemption thresholds are set by Arlington County itself and are the part that varies most between neighbouring jurisdictions, so read them on the official source.
How do I apply for a building permit in Arlington County, Virginia?
Applications in Arlington County, Virginia are made through Accela Citizen Access. Register an account first, select the permit type matching your scope, upload drawings, and pay the invoice when the system issues it. Contact the office to confirm the current method before preparing a package.
How do I look up a building permit in Arlington County, Virginia?
Arlington County publishes an online permit records search through Accela Citizen Access. Search by parcel number where possible, because addresses get renumbered over time while parcel numbers usually do not.
Where is the Arlington County permit office?
The address published by Arlington County is 2100 Clarendon Boulevard, Arlington, VA 22201. Counter hours for permit intake are often shorter than the building's general opening hours, so confirm before making a special trip.
How much does a building permit cost in Arlington County, Virginia?
We do not publish fee amounts for Arlington County, Virginia, because permit fees are set by local ordinance and revised without notice — a stale figure would be worse than none. The invoice is normally built from a base fee tied to declared valuation, a plan review fee, separate trade permits, and surcharges listed apart from the headline number. Read the current figures on the fee schedule published by Arlington County.
How long does a permit take in Arlington County, Virginia?
We do not publish review times, because they vary by season, staffing and how complete the submission was, so any figure here would be a guess. Ask Arlington County for their current review time when you submit; most offices will tell you. What you can control is the correction round — responding to every comment in one complete resubmission rather than piecemeal routinely halves the elapsed time.
Which building code applies in Arlington County, Virginia?
Construction in Arlington County, Virginia is reviewed against the Virginia Uniform Statewide Building Code. Arlington County enforces that code and may add local amendments on top of it, commonly for wind, seismic, snow load, floodplain or energy provisions.
Does Arlington County or my city issue the permit?
Arlington County issues permits for unincorporated territory. If the property sits inside an incorporated city or town, that municipality issues the permit instead and applying to the county will only lose you time. A city mailing address does not settle it — check the parcel record in the county parcel or GIS viewer, which names the jurisdiction.
Can a homeowner pull their own permit in Arlington County, Virginia?
In most jurisdictions yes, for work on a home you own and occupy, by signing an owner-builder declaration. It moves liability for the work onto you, and in some states restricts selling the property for a period afterwards. Ask Arlington County for its owner-builder terms and read them before signing.
What happens if work was done without a permit in Arlington County, Virginia?
Retroactive permitting is a normal process rather than an exceptional one. Expect a penalty — commonly a doubling of the permit fee — and be ready to expose concealed work for inspection. Raising it yourself is treated very differently from having it discovered by a complaint or at sale.
Are Arlington County, Virginia building permit records public?
Yes. Permit records are public records in Virginia, and you do not need to own the property to obtain them. Arlington County publishes a searchable record online, so most requests need no contact with the office at all.
How do I check if work on a Arlington County property was permitted before I buy?
Pull the permit history by parcel number and compare it against what the property physically contains. A finished basement, converted garage, added bathroom or deck with no matching permit is the signal. Also compare the assessor's recorded square footage against the listing square footage — a gap usually means unpermitted conditioned space. Do this before the inspection contingency expires, not after.
What does an open permit on a Arlington County property mean for the sale?
It means the work was authorised but never signed off at final inspection, and the obligation transfers to whoever owns the property next. Title companies flag them, lenders ask about them, and buyers use them to renegotiate. Closing one means completing the outstanding inspections, which sometimes means opening up finished work. Resolve it before listing rather than under contract.
Can I schedule a building inspection in Arlington County, Virginia online?
Yes. Arlington County takes inspection requests online, and the link is on this page. Ask what the daily cutoff time is when the permit is issued — requests after it roll to the next business day, and the cutoff is usually earlier than people expect.
What happens if a Arlington County inspection fails?
You get a correction notice listing exactly what must change, and you request a reinspection once every item on it is fixed. Most jurisdictions charge a reinspection fee from the second visit onward. Do not move to the next construction stage and do not cover anything that failed. If you think the inspector is wrong, ask which code section is being cited — that is a reasonable request and most disputes end there.
How this page was checked
Source: arlingtonva.us
Last retrieved: 2026-08-06
We retrieved the page above and read the department detail from it directly.
The permitting platform was identified as Accela Citizen Access from the jurisdiction's own links.
No direct phone number was published on the page we retrieved, so we do not show one rather than guess.
We do not publish fee amounts or processing times. Those are set locally, change without notice, and a stale figure is worse than none.
Found something out of date? Tell us and we will re-check it.